CASE STUDY

Keeping boilers on for vulnerable customers during power outages

Impact:

Transformational

Key benefits/themes:

Customer Services, Health & Safety, Operational.,

Project partners:

Egnida, Northern Gas Networks (NGN)

Keeping boilers on innovation for vulnerable consumers

The Challenge

Due to climate change, storms are becoming more frequent and unpredictable. Power outages caused by storms are becoming more severe, meaning that customers can be without power for longer periods than previously.

This mix of circumstances is creating an increased risk to health and - in some cases - to life for vulnerable residents. The impact, particularly of Storm Arwen, resulted in interventions from both the UK Government and the regulator, Ofgem. 

Under “normal” weather conditions, current preventive and reactive methods have proved adequate. These include vegetation management, fast response to restore all power in the relevant areas and deployment of petrol generators to maintain supplies to specific houses of known vulnerable residents. 

However, with the increasing frequency and severity of weather events that are now being experienced, these measures are far less effective and can leave vulnerable residents more exposed to risk.   

The Solution

  • The overall aim of this project is to create an integrated solution that uses temporary, portable and zero emission power sources, to keep vulnerable residents’ boilers and associated systems operational during power outages. The key project outputs will be:  

    - A method of identifying geographical areas where there are vulnerable residents likely to be at risk. 

- A way of engaging with key stakeholders in areas most at risk, in particular social housing providers and local authorities   

- A technical and operational solution that allows practical and cost-effective deployment of portable zero emission power sources during periods of high risk.

 

In the majority of outage situations, the gas supply to a property remains unaffected and so the purpose of this project is to prove that portable sources can be used to power residents’ gas (or other fuel) central heating systems. The portable power units will also include remote monitoring to enable the energy network operator to replace/recharge the units before they run out of power.

EIC icon_network 2

Project Partners

This NIA funded project is being delivered by Egnida, an SME specialising in decarbonisation, with support from Northern Gas Networks (NGN). 

The project was first pitched to NGN’s vulnerability team in spring 2022, before the EIC was asked to support the development of the project and provide legal support in accordance with NIA governance ahead of an autumn 2022 start date. This rapid project initiation meant that key research and testing could be conducted throughout the heating season of 2022-23.
 
The outputs of the project will deliver significant social benefits by enabling NGN to provide better support for vulnerable residents in its licence area. In the event of a power outage, the solution will offer a means of ensuring that those who are vulnerable can continue to heat their homes. 

The EIC was instrumental in supporting the swift development of the project plan and legal discussions that were required to meet the start date. The majority of the testing and research to date has been completed in-house by Egnida. The EIC has facilitated input from relevant stakeholders across NGN and its neighbouring electricity distribution network operator, Northern Powergrid. 

The Project

This project is leveraging existing battery solutions with appropriate capabilities that can be deployed at short notice. Research was conducted to determine the amount of power a typical boiler would require for standard operation. The battery units were then tested on a boiler at Egnida’s facility with positive results. The solution is due to be further verified at NGN’s National Energy Research Village (NERV) test facility in February 2024.

IMG_7269
Vulnerable consumers UK

In tandem with the testing, Egnida has developed a number of deployment options that can be adopted by NGN and other interested network operators. These options will be combined with final test results in an end of project report that will be disseminated across the industry. 

A key lesson learnt to date is that the power required by a boiler does not depend on ambient temperature. The power requirements are constant, essentially enabling a portable power source to guarantee a set number of hours that the boiler can operate for. 

The Impact

EIC icons white-10 (1)

Customers

The solution focuses on reducing the risk to life and health to vulnerable customers and could also be deployed in community centres.

EIC icons white-23

Operational

When not being used to support vulnerable customers in power outages, the portable batteries can be used instead of standby generators, displacing expensive and polluting diesel. 

EIC icons white-01

Health and safety

Secondary use of portable batteries is better for health and safety than the alternative of running petrol or diesel generators / engines.

EIC icons white-45

Environmental

Carbon and air quality benefits compared to using existing fossil fuelled generator alternatives.

The Project

The aim of StreetScore Phase 2 project was to improve the accessibility and experience of street works for customers in vulnerable situations and the wider public. The focus was on prototyping and validating concepts that could minimise disruptions experienced during street works, before potentially undertaking further developmental and testing activities that facilitates the transition to Business as Usual (BAU) deployment(s).

Streetworks SGN

Workshops were also held to facilitate active engagement between network operators and key stakeholders, such as community groups, charities and advocacy groups. These sessions allowed network operators to develop a greater understanding of the challenges faced by customers in vulnerable situations and provided valuable insights into how customers adapt their behaviours and lifestyle around street works. The feedback gathered has also helped to inform the shortlisting of potential prototypes and concepts for future development.

Streetworks SGN

The Impact

EIC icon_energy 5

Customers

Improvements in accessibility and safety around street works, particularly for customers in vulnerable situations.

EIC icon_energy 5

Community engagement

Improved engagement between network operators and third parties like community groups and charities.

EIC icon_energy 5

Health and safety

Potential to reduce the number of incidents for customers when navigating street works. Learnings from the project have also enabled recommendations for changes or updates to existing regulations.

EIC icon_energy 5

Financial

Improved guidance in working around street works thus reducing instances of fines for networks.

The Impact

EIC icons white-04

Customers

Improvements in accessibility and safety around street works, particularly for customers in vulnerable situations.

EIC icons white-10

Community engagement

Improved engagement between network operators and third parties like community groups and charities.

EIC icons white-40

Health and safety

Potential to reduce the number of incidents for customers when navigating street works.

EIC icons white-08

Financial

Improved guidance in working around street works thus reducing instances of fines for networks.

The Project

This project is leveraging existing battery solutions with appropriate capabilities that can be deployed at short notice. Research was conducted to determine the amount of power a typical boiler would require for standard operation. The battery units were then tested on a boiler at Egnida’s facility with positive results. The solution is due to be further verified at NGN’s National Energy Research Village (NERV) test facility in February 2024.

Streetworks SGN

In tandem with the testing, Egnida has developed a number of deployment options that can be adopted by NGN and other interested network operators. These options will be combined with final test results in an end of project report that will be disseminated across the industry.

A key lesson learnt to date is that the power required by a boiler does not depend on ambient temperature. The power requirements are constant, essentially enabling a portable power source to guarantee a set number of hours that the boiler can operate for.

Streetworks SGN

The Impact

EIC icon_people 2

Customers

The solution focuses on reducing the risk to life and health to vulnerable customers and could also be deployed in community centres.

EIC icon_people 1

Operational

When not being used to support vulnerable customers in power outages, the portable batteries can be used instead of standby generators, displacing expensive and polluting diesel. 

EIC icon_green minded

Health and safety

Secondary use of portable batteries is better for health and safety than the alternative of running petrol or diesel generators / engines. 

EIC icon_globe trees

Environmental

Carbon and air quality benefits compared to using existing fossil fuelled generator alternatives.

Next steps

The portable power sources will be tested on a range of boilers in properties at the NERV test site. Following this, a final report (including the findings of these tests) will be prepared and disseminated to relevant stakeholders. The report will also include an outline of different potential routes to deployment for consideration by NGN. The aim is to provide the necessary support required to deploy the solution ahead of winter 2024-25. 

As deployment may require a minor boiler modification, social housing providers will be kept informed of project progress to ensure that they have adequate time to make any arrangements for the modifications ahead of next winter. 

Keeping boilers on innovation for vulnerable consumers
Download a PDF copy of this case study

Please enter your email and we'll send a copy to you.

4

Access to the latest opportunities in the industry

EIC icon_money 2

Funding support and guidance

EIC icon_network 3

Connect and collaborate with innovators in the industry

The EIC Hub dashboard

Sign up to our energy innovation hub to take advantage of the benefits and see our innovation opportunities

4

Access to the latest opportunities in the industry

EIC icon_money 2

Funding support and guidance

EIC icon_network 3

Connect and collaborate with innovators in the industry

The EIC Hub dashboard

Sign up to our energy innovation hub to take advantage of the benefits and see our innovation opportunities