CASE STUDY

Fluid Cable Care
Phase 3 

 

Impact:

Disruptive

Key benefits/themes:

Customers, Environmental, Financial

Project partners:

Kinectrics UK’, UK Power Networks and Northern Powergrid

Anagen Vials

The Challenge

There are more than 4,750km of Fluid Filled Cables (FFC) across the UK electricity network, dating as far back as the 1930s. All these cables are insulated with tightly-lapped cellulosic paper, impregnated with a low viscosity dielectric fluid that enhances the insulation system electrically and thermally. 

As FFC networks age, if the cable sheath or accessories are damaged, the fluid leaks out from the insulation layer into the surrounding environment. In the UK, it’s estimated that approximately 375,000 litres of fluid is lost from FFCs in this way annually.

The Solution

The aim of this project was to develop a Self-Healing Fluid (SHF), known as Anagen, which would help to address this challenge. 

During normal operations, Anagen functions as an insulation oil within the cable system. 

However, in the event of an oil leakage caused by cable damage, Anagen will crosslink to form a solid mass, sealing the defect. This stops the leak and prevents further leaks down the cable, which protects the local environment and the cable itself.

“NIA funding has been essential in enabling this innovation as it would have taken significantly longer without it, if not been impossible to achieve. At the end of the project, UKPN aims to adopt this technology into our operational processes, meaning the highest TRL of 9 will have been achieved.”

 

Robert Davies , Innovation Engineer, UKPN

EIC icon_network 2

Project Partners

The first two phases of the project were delivered by SME innovator, Gnosys Global, which has since been acquired by Kinectrics UK. 

Developmental activities in the current phase of the project are being collaboratively funded by UK Power Networks and Northern Powergrid via the Network Innovation Allowance (NIA) framework. Thanks to this support, the networks have worked with the innovator to advance the solution from Technology Readiness Level (TRL) 2 to 8.

The EIC has facilitated and supported all three phases of the project, over a period of over 10 years, from project plan development, legal contracting and project delivery, all in accordance with NIA governance. 

The EIC also supported engagement with test houses both in the UK and abroad to develop a testing regime to prove the solution. This was essential in refining project requirements and identifying the most suitable test house.

The Project

The first two project phases successfully identified, developed and evaluated new self-healing polymers that could mitigate leakages, one of which was Anagen. They also involved controlled testing to evaluate the application of Anagen within cable systems and refine its production processes. 

The phase 3 project seeks to advance the deployment of Anagen in FFC networks in the UK, which includes introducing it into cables in the same way as a standard cable oil, i.e. as a top-up fluid. 

Engineer working on fluid cable care phase 3
Fluid cable care phase 3 case study

Testing is planned in to ensure that the formulation of Anagen is electrically compatible with existing cable systems. Testing will also help develop greater understanding of Anagen’s operation and handling. Field trials will also be completed in circuits selected by the networks.

It’s expected that this project will enable a greater understanding of how cable oil flows, mixes and dilutes with Anagen within the cable system. This will allow Anagen to be effectively deployed at leak sites to facilitate repairs and containment of cable oil.

The Impact

EIC icons white-04

Customers

Potential to reduce the number of disruptions experienced by customers as a result of repair and maintenance activities.

 

EIC icons white-08

Financial

Reduction in the number of leak repair activities currently undertaken. It’s estimated that the average oil repair cost for a single leak is around £45K while cable replacement costs are approximately £500K per km.

EIC icons white-40

Environmental

Reduction in the loss of cable fluid into the environment as a result of containment enabled by the Anagen solution.

The Project

The first two project phases successfully identified, developed and evaluated new self-healing polymers that could mitigate leakages, one of which was Anagen. They also involved controlled testing to evaluate the application of Anagen within cable systems and refine its production processes. 

The phase 3 project seeks to advance the deployment of Anagen in FFC networks in the UK, which includes introducing it into cables in the same way as a standard cable oil, i.e. as a top-up fluid.

Streetworks SGN

Testing is planned in to ensure that the formulation of Anagen is electrically compatible with existing cable systems. Testing will also help develop greater understanding of Anagen’s operation and handling. Field trials will also be completed in circuits selected by the networks.

It’s expected that this project will enable a greater understanding of how cable oil flows, mixes and dilutes with Anagen within the cable system. This will allow Anagen to be effectively deployed at leak sites to facilitate repairs and containment of cable oil.

Streetworks SGN

The Impact

EIC icon_people 2

Customers

Potential to reduce the number of disruptions experienced by customers as a result of repair and maintenance activities.

EIC icon_money 4

Financial

Reduction in the number of leak repair activities currently undertaken. It’s estimated that the average oil repair cost for a single leak is around £45K while cable replacement costs are approximately £500K per km.

EIC icon_lightbulb plant

Environmental

Reduction in the loss of cable fluid into the environment as a result of containment enabled by the Anagen solution.

“Anagen™ arose from a challenge set out by UK network operators to reduce leakage from fluid filled cables. Over the course of three NIA-funded projects (lasting over ten years), Anagen™ was developed from laboratory scale trials into a tangible solution that is produced on the multi-tonne scale and deployed in cables over 1km in length.  NIA funding has been crucial to this achievement and it allows network operators to assign funds to the development of innovative solutions to help solve intractable problems.”

 

Anuj Nayyar - Business Development Director - Kinectrics UK

The Project

The aim of StreetScore Phase 2 project was to improve the accessibility and experience of street works for customers in vulnerable situations and the wider public. The focus was on prototyping and validating concepts that could minimise disruptions experienced during street works, before potentially undertaking further developmental and testing activities that facilitates the transition to Business as Usual (BAU) deployment(s).

Streetworks SGN

Workshops were also held to facilitate active engagement between network operators and key stakeholders, such as community groups, charities and advocacy groups. These sessions allowed network operators to develop a greater understanding of the challenges faced by customers in vulnerable situations and provided valuable insights into how customers adapt their behaviours and lifestyle around street works. The feedback gathered has also helped to inform the shortlisting of potential prototypes and concepts for future development.

Streetworks SGN

The Impact

EIC icon_energy 5

Customers

Improvements in accessibility and safety around street works, particularly for customers in vulnerable situations.

EIC icon_energy 5

Community engagement

Improved engagement between network operators and third parties like community groups and charities.

EIC icon_energy 5

Health and safety

Potential to reduce the number of incidents for customers when navigating street works. Learnings from the project have also enabled recommendations for changes or updates to existing regulations.

EIC icon_energy 5

Financial

Improved guidance in working around street works thus reducing instances of fines for networks.

The Impact

EIC icons white-04

Customers

Improvements in accessibility and safety around street works, particularly for customers in vulnerable situations.

EIC icons white-10

Community engagement

Improved engagement between network operators and third parties like community groups and charities.

EIC icons white-40

Health and safety

Potential to reduce the number of incidents for customers when navigating street works.

EIC icons white-08

Financial

Improved guidance in working around street works thus reducing instances of fines for networks.

Next steps

This solution is applicable to all Distribution Network Operators (DNOs), with the potential for application by transmission network operators too. 

Provided that the project and subsequent network trials are successful, the Anagen fluid could be introduced into FCC networks in the UK. Learnings to-date have validated Anagen’s potential as a cheaper alternative to repairing or replacing cable sections with leakages.

Screenshot 2024-02-23 at 08-16-11-2
Download a PDF copy of this case study

Please enter your email and we'll send a copy to you.

4

Access to the latest opportunities in the industry

EIC icon_money 2

Funding support and guidance

EIC icon_network 3

Connect and collaborate with innovators in the industry

The EIC Hub dashboard

Sign up to our energy innovation hub to take advantage of the benefits and see our innovation opportunities

4

Access to the latest opportunities in the industry

EIC icon_money 2

Funding support and guidance

EIC icon_network 3

Connect and collaborate with innovators in the industry

The EIC Hub dashboard

Sign up to our energy innovation hub to take advantage of the benefits and see our innovation opportunities