SF6 Leak Detection, Capture & Repair Solutions

What’s the Problem? Electricity distribution network operators operate many assets containing sulphur hexafluoride (SF6), a potent greenhouse gas used in gas-insulated electrical equipment. While the industry is transitioning to SF6-free alternatives, many existing SF6 assets will remain in service for years to come. SF6 leaks commonly happen at connection points such as flanges, bolted joints […]
Safer Access for Temporary Street Works Barriers

The Problem UK utility companies look after and improve services for their customers. Many of these services are underground, especially in high-density urban areas with lots of people. They include electricity cables, gas pipes, water and telecommunications. When these services need repair or improvement, utilities often need to dig up roads. This work often includes […]
Alternatives to Wooden Utility Poles

The Problem Distribution network operators (DNOs) use wooden poles to support their overhead networks. To maintain their network, DNOs replace around 100,000 poles every year. Whilst wooden poles remain a cost-effective option, there are a number of challenges that are limiting their use, such as: Some engineered alternatives have been developed, such as GRP poles, […]
Keeping Communications Open During Power Outages

What’s the Problem? The UK’s transition from the legacy public switched telephone network (PSTN) to fibre-based telecommunications services such as fibre to the premises (FTTP) and fibre to the cabinet (FTTC) has introduced increased dependency on locally powered communications equipment. During prolonged power outages or extreme weather, customers can lose access to services when equipment […]
Live Low Voltage (LV) Cable Tester

What’s the Problem? Electricity distribution network operators (DNOs) are responsible for ensuring the safe and reliable supply of electricity to new and existing customers requiring upgrades or modifications on the low voltage (LV) network. To deliver this, distribution networks are extended, repaired and adapted. This work requires cable joints to be installed to connect new […]
Network Truck Traction Solution

What’s the Problem? SP Energy Networks use Unimog Live Line Hands-On (LLHO) trucks to facilitate live line work, which is essential in maintaining continuity of supply and reducing the need for planned outages. However, the use of these trucks is often constrained in rural locations due to limited site access and poor ground conditions. A […]
Temporary Low Voltage (LV) Electrical Joint Solution

What’s the Problem? Under current practice, removing a permanent resin joint means cutting it out and jointing in a new cable section. A temporary LV joint should instead be removable without cutting back or re-stripping cables, avoiding extra excavation or roadworks. This would allow faster fault restoration and let cables be pot-ended and left safely […]
Power Outage Resilience for Electricity Networks & Communities

As the UK moves toward net zero, more households are switching to electric vehicles (EVs) and adopting electricity-based heating solutions such as heat pumps. Simultaneously there’s an increasing use of internet-connected devices and digital communication systems, making people become more reliant on a stable and uninterrupted electricity supply. As dependency grows, disruption to electricity supply […]
SIF Challenge: Net Zero Substations on the Street

With the UK’s ambition to achieve net zero by 2050 there has been and will be a significant rise in low carbon technologies: This increased demand necessitates substantial upgrades to the electricity network, including the installation of new cables and additional substations to support the grid’s capacity requirements to achieve net zero. Housing estates built […]
Adding Efficiency to the Trenches

With the UK’s ambition to achieve net zero by 2050, there is a significant rise in low carbon technologies, leading to increased demand for infrastructure upgrades: The increasing demand for low carbon technologies necessitates significant upgrades to outdated mains cables. As most utility assets in the UK are located underground, excavation is essential for any […]