Reducing Water Usage During Pipeline Testing

Call
H20-19-01
Reducing Water Usage During Pipeline Testing

 

An EIC water partner will be installing 545km of 600-900mm welded HDPE (high density polyethylene) or welded epoxy coated carbon steel pipeline with intermittent flanged joints, to transfer water from an area of high-water resource to an area of lower water resource availability. Once in operation this pipeline will form part of a national critical infrastructure smart network to improve supply resilience for customers, drought resilience across the region and improve network performance by means of a digital twin.