Reducing Excavations During Ground Moling

Call
ICA-20-13
Reducing Excavations During Ground Moling

Ground Moling is a method of laying gas pipes, without the need for digging long trenches. During Ground Moling, two pits are dug at a set distance apart. The mole will enter the first pit and make its way through the ground horizontally, creating a bore hole and exiting via the second pit. Once a bore hole has been completed, the mole will be extracted, and the product pipe will be pulled in.