Adaptation of Existing Polyethylene Branch Saddle

As part of an ongoing mains replacement program due to be completed by 2032, the network behind this call has upgraded a portion of their metallic mains. However, they are still faced with significant challenges in relation to the quantity of large excavations required for the number of larger diameter pipes still to be replaced.